  1. Ready-clad facade
    In order to reduce handling on the building site, the wall elements can be delivered factory-fitted with windows and wall cladding.
  2. 45 mm edge-glued board
    Glue joints across the board allow moisture to be transported through the wood, so the structure can breathe.
  3. Spaced-out studding
    Gives the boards added rigidity.
  4. Cross-mounted edge-glued board
    The cavity is filled with wood-fibre insulation in the factory. Wall thickness depends on the project in question, and the elements can be used for anything from cabins to an energy-plus house.
  5. 45 mm edge-glued board
    Glue joints across the board allow moisture to be transported through the wood, so the structure can breathe.
  6. Floor structure
    Conventional HDF or solid floor structures made of concrete are cast in place against pre-fitted pins in the wall. Insulation is laid outside these.
  7. Foundations and joist
    Up to four storeys can be erected on one cast slab without piling, depending on the ground conditions. Each new layer of wall elements is positioned on a glulam joist.

Construction

The wall is ordered on the basis of drawings as flat elements or standard sections 3000 mm wide and either 2700 mm or 3000 mm high.

In constructional terms, the element consists of glulam, resulting in a very rigid and robust framework, with a wood content several times greater than walls with conventional stud framing.

  1. The elements are easy to transport and efficient to manufacture in large groups. Compared to equivalent concrete elements, they generate fewer bottlenecks and the dependence on just-in-time deliveries is reduced.
  2. Up to four storeys can be erected on one cast slab without piling, depending on the ground conditions.
  3. Conventional HDF or solid floor structures made of concrete provide excellent attenuation of footstep noise. The floor structure elements are cast in place against pre-fitted pins in the wall.
  4. In order to reduce handling on the building site, the wall elements can be delivered factory-fitted with windows and wall cladding.
  5. The elements are lifted in groups to the level where they are to be installed. Lifts are shorter and safer than for heavier concrete elements.
  6. The elements are glued and screwed together in situ and the structure is provided with expansion joints.
  7. Internal walls can also be lifted into position as pre-fabricated elements.
  8. Normally the loft area does not come with integrated insulation, but the roof structure can also be made up of pre-insulated roof cassettes.